No artwork
0.0
Tommy's Train
2021
Non-stop run-by action of SEPTA and AEM-7 powered trains.
Volume Two features trackside SEPTA electric action at Pennsylvania locations including Glenside, Elkins Park, Melrose Park, Fern Rock, Daylesford, Paoli, and Malvern. Many Silverliner IV MU's are seen along with former PRR Silverliner III, and former PRR and RDG Silverliner II equipment. The MU's have been painted into an attractive rainbow paint scheme recently adopted by SEPTA. In addition, SEPTA's AEM7 electric locomotives are seen pulling Bombardier push pull train sets as well as Amtrak Genesis diesels powering Keystone Service trains. Filmed and narrated by Tim Hosey in April 2001; edited by Nick Lipka
Tim Hosey
Narrator
2021
2024

1896


1931

2010
1965
1962
1961

2023
1958
1965